Installation of rainwater and meltwater purification and drainage system for biomass storage yards at the Połaniec Power Plant site
Investor
Połaniec Power PlantGDF Suez Energia Polska
Location
Zawada near Połaniec
Scope of work
- Preparation of a conceptual project and compilation of necessary data for the development of the construction project;
- Installation in accordance with the approved concept and the construction project provided by the client, comprehensive execution of the installation for treating rainwater from the specified areas, including the construction of a buffer tank to collect water from the proposed drainage system in the designated catchment area as outlined in the map and inquiry, water intake from the tank, water treatment to the required legal standards, and discharge to the recipient - a discharge channel for cooling water from the Power Plant, ultimately leading to the Vistula River;
- Commissioning of the installation, conducting start-ups, trial runs, and performing all necessary tests, etc.
Utilized technologies
see other projects