Design, delivery of equipment, and construction of a turnkey Water Block as part of the investment project "Expansion of fertilizer production capacities at the ANWIL Nitrogen Works".
Investor
PROCHEM S.A.
Location
Włocławek
Scope of work
The scope of the task included the implementation on a "turnkey" basis, i.e. multidisciplinary project, comprehensive execution, and commissioning, of a Water Block with a hydraulic capacity of 13,000 m3/h, preparing circulating cooling water. The main technological element of the Block is a fan cooling tower and a pumping station. The cooled circulating water undergoes conditioning and filtration processes.
Utilized technologies
see other projects