Designing and building a brine filtration system at the Soda-Mątwy Plant for CIECH Soda Polska.
Investor
CIECH Soda Polska S.A.
Location
Inowrocław
Scope of work
The scope of work included designing and constructing a complete installation for filtering purified brine, aimed at reducing calcium and magnesium ions in the brine, which will serve as the second stage of filtration (after decanters) in the existing brine purification plant at ZP "Soda Mątwy", along with a rinsing and distribution pump station.